    Elbows, this area by Pizza Hut is actually in Alexandria. They’ve been given a heads up on your message….

    It also sounds like the Arlington engineers are working on a signal/intersection project at the S. Glebe & W. Glebe crossing.

    Keep the suggestions coming!

    Tim Kelley
    Participant

    I passed your comments along to our engineering team and this is the explanation I received:

    “The reason the pedestrian pushbutton is required at these intersections is that if no pedestrian phase is required, the traffic signal will default to providing the shortest necessary green time for the vehicles on the minor street in order to minimize the major street delay. This default minor street green time may not be enough time for pedestrians to safely cross the street, thus the green pedestrian signal is only displayed if a pedestrian phase is called. At the intersections mentioned, the trail crossing follows the minor street (Four Mile Run Dr. at Shirlington Rd., Four Mile Run Dr. at Columbia Pike, etc.) therefore the pushbutton is required to provide the additional green time for pedestrians to cross.

    This type of signal control (requiring the pedestrian phase to be activated) is consistent throughout most of Arlington outside of the Rosslyn-Ballston corridor. Pedestrians, and cyclists who are crossing as pedestrians, should only cross when a green pedestrian signal is displayed regardless of what is shown on the overhead traffic signal.”

    in reply to: Bike to Work Day #923468
    Tim Kelley
    Participant

    T-shirt and FREE breakfast! And a bunch of other cool stuff–BikeArlington water bottles, bags, bells, etc….

    in reply to: Rock gap in Custis Trail at Rosslyn? #923435
    Tim Kelley
    Participant

    Thanks–I’ll pass along your comments!

    in reply to: Falls Church City Trail Closed for construction #923422
    Tim Kelley
    Participant

    Great post! Thanks for the heads up…

    in reply to: Gravel in bike lanes on N Veitch #923407
    Tim Kelley
    Participant

    I’ll pass it along–thanks for the suggestion!

    in reply to: Arlington’s toughest hills list #923390
    Tim Kelley
    Participant

    I’m intrigued by this “Kill Bill” loop. I found a cue sheet for it, but does anyone have it mapped out somewhere? Any idea of total elevation gain?

    in reply to: Simple way to carry U lock #923369
    Tim Kelley
    Participant

    @Dirt 421 wrote:

    I guess there’s some workout value to wearing it around my neck.

    That’s what Mr. T would do…

    Tim Kelley
    Participant

    Deb–here’s what I’ve heard from Transportation Engineering & Operations team:

    “Arlington County has two pavement marking projects in this area that will include signage for bicyclists.

    Northbound/eastbound Walter Reed Drive from Four Mile Run Drive to Pollard Street will be re-marked to include a parking lane and a bike lane (going up the hill). As part of this project there will be bike lane signage added to this segment.

    Walter Reed Drive between Four Mile Run Drive and the county line (King St) is currently being re-marked and will include bicycle facilities. Between Four Mile Run and Arlington Mill Drive there will be bike lanes, and south of Arlington Mill Drive there will be shared-lane markings in the wider curbside lane. As part of this project there will be “Bikes May Use Full Lane” signs added to Walter Reed Drive.

    Additionally we are considering adding the new Trail Crossing sign showing both bikes and pedestrians to the W&OD trail crossings at Walter Reed Drive and George Mason Drive.”

    Tim Kelley
    Participant

    Hi Deb–the County Bike/Ped planning team and the engineers on the Transportation team have been made aware of your posting.

    At this week’s BAC meeting I heard that there are a number of changes that will be happening to that specific area in the coming months.

    I’ll let you know if I hear more!

    in reply to: Useful Article on "Claiming the Lane" #923307
    Tim Kelley
    Participant

    @Brendan von Buckingham 345 wrote:

    For context, I was eastbound on Clarendon Boulevard between Highland (Clarendon M) and Veitch (Courthouse M). There is a bike lane there, but it’s filled with a temporary covered pedestrian walkway, construction debris, severe potholes at Fillmore, double parkers at Clarendon Common, and backed up parking lot traffic at Starbucks. Not to mention it’s downhill and my speed was 25-30. Not only was I claiming the whole right lane to the left of the unsafe bike lane, but I even passed a car in the left lane immediately after the incident. So I was keeping up with traffic fine.

    I ride that same section on my commute and always make a point to move into the road from the bikes lanes around the pedestrian walkway. So far, I’ve had good luck with courteous drivers.

    Tim Kelley
    Participant

    I emailed our Bike/Ped infrastructure team about this issue and I got a quick reply back:

    “We’ll direct it to both our Water Sewer Streets and to VDOT. It might be easier (and faster) to have our people do it even if it is the state’s responsibility.”

    I’ll keep you in the loop if I hear more!

    in reply to: Fairfax County reclassifies bicycles as potted plants #923204
    Tim Kelley
    Participant

    @Dirt 194 wrote:

    I sent an e-mail to Mr. Cook and invited him to join me on Bike to Work day.

    Hey Pete–do you happen to have Mr. Cook’s email address handy in case other forum users would like to invite Mr. Cook out for a bike ride?

    in reply to: Are the roads/trails you use clear of snow? #923201
    Tim Kelley
    Participant

    @Dirt 190 wrote:

    If I build this thing, it will likely be the only SRAM Red equipped tricycle with studded snow tires in existence. Yes. I’m a moron.

    PICS or it didn’t happen!! Can’t wait to see how it turns out…

    in reply to: snow removal from bike paths #923185
    Tim Kelley
    Participant

    Here are a few pictures of the Custis Trail taken this morning. Not only have the large piles at the intersections been removed, but the County was also able to clear the trail from Lynn St all the way up to Veitch Street. No more ice luge!

    [ATTACH]109[/ATTACH] [ATTACH]111[/ATTACH] [ATTACH]110[/ATTACH] [ATTACH]112[/ATTACH] [ATTACH]113[/ATTACH]