Likes Likes:  4
Dislikes Dislikes:  0
ELITE ELITE:  0
Page 2 of 2 FirstFirst 12
Results 11 to 13 of 13

Thread: Wilkes Street Bikeway Update

  1. #11
    Join Date
    Aug 2011
    Location
    Alexandria, VA
    Posts
    883
    Post Thanks / Like

    Default

    Quote Originally Posted by consularrider View Post
    Are there ant detour routing signs?
    Not yet. I have sent emails, but haven't gotten a response. Originally, I had been told the work would not require detours. Yesterday, a city employee at the site told me the work was only going to take one day.

  2. #12
    Join Date
    Dec 2010
    Location
    Alexandria, VA
    Posts
    52
    Post Thanks / Like

    Default

    FWIW, there is a posting about this bikeway over at GGW:
    http://greatergreaterwashington.org/...-a-bike-safer/

  3. #13
    Join Date
    Aug 2011
    Location
    Alexandria, VA
    Posts
    883
    Post Thanks / Like

    Default

    The contractor has finished putting in the bike signs and pavement markings. They had to stop putting down the markings on Fayette Street, as that portion of the road between Wilkes and Duke is a private road. The City still needs to finish realigning the path between Alfred and Patrick and hopefully make some adjusts to some of the signals.


    A Do Not Enter sign instead of bollards
    Click image for larger version. 

Name:	image.jpg 
Views:	94 
Size:	19.7 KB 
ID:	10452

    Sidewalk markings at Patrick Street
    Click image for larger version. 

Name:	image.jpg 
Views:	89 
Size:	19.8 KB 
ID:	10453

    One of the Wayfinding signs
    Click image for larger version. 

Name:	image.jpg 
Views:	91 
Size:	20.4 KB 
ID:	10454

    Another stop sign for bike riders, this one is westbound coming out of the Wilkes Street tunnel
    Click image for larger version. 

Name:	image.jpg 
Views:	100 
Size:	19.2 KB 
ID:	10455

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •