Likes Likes:  547
Dislikes Dislikes:  6
ELITE ELITE:  8
Page 53 of 58 FirstFirst ... 3435152535455 ... LastLast
Results 521 to 530 of 576

Thread: Good News on Infrastructure thread

  1. #521
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    4,320
    Post Thanks / Like

    Default

    Quote Originally Posted by Starduster View Post
    OK fellow lumberjacks: What do we do now?
    Isn't that the cone and barrel on the right side of the picture?

  2. Likes Steve O liked this post
  3. #522
    Join Date
    Jul 2012
    Location
    Arlington, VA
    Posts
    812
    Post Thanks / Like

    Default

    Quote Originally Posted by Judd View Post
    Detour is going to continue to be in place for another three months.
    Looks like one lane of motor vehicle traffic each way. Exposure to turning traffic, but limited. I can live with that to a point. Big question-when will they finish work underneath the bridge so that the trail route can reopen?

  4. #523
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    4,320
    Post Thanks / Like

    Default

    Quote Originally Posted by Starduster View Post
    Looks like one lane of motor vehicle traffic each way. Exposure to turning traffic, but limited. I can live with that to a point. Big question-when will they finish work underneath the bridge so that the trail route can reopen?
    My understanding is that the trail detour will be in place until the end of the project in 3 months. With the bridge opened to vehicles, trail users have a pretty long wait to get the signal.

  5. #524
    Join Date
    Nov 2019
    Location
    Arlington
    Posts
    187
    Post Thanks / Like

    Default

    Quote Originally Posted by Judd View Post
    My understanding is that the trail detour will be in place until the end of the project in 3 months. With the bridge opened to vehicles, trail users have a pretty long wait to get the signal.
    Disappointing that the project was scheduled in such a way that 4MR trail users will have to navigate a high-volume street crossing for THREE MONTHS.

  6. Likes Steve O liked this post
  7. #525
    Join Date
    Jul 2012
    Location
    Arlington, VA
    Posts
    812
    Post Thanks / Like

    Default

    Quote Originally Posted by arlcxrider View Post
    Disappointing that the project was scheduled in such a way that 4MR trail users will have to navigate a high-volume street crossing for THREE MONTHS.
    Yeah, I didn't expect that. I don't think we were told, even early on. The trail underneath will be blocked until they finish up and remove the temporary ped bridge. Rode by there today and will confirm everyone's observations. Not ideal.

    Also on the journey, at the end of S. Eads, at the "driveway", a solitary traffic barrel stands sentry. A second barrel is tucked against the fence, awaiting deployment. I could do nothing with it because a guy was sitting in a parked car there. This is a job for another covert lumberjack...

  8. #526
    Join Date
    Dec 2015
    Location
    Arlington
    Posts
    1,715
    Post Thanks / Like

    Default

    At the new Glebe Road Bridge, note also that westbound they got the ADA ramp a bit wrong and you could easily flat if you weren't careful. It's not as bad as the East Basin Drive ramp in DC.

  9. #527
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,378
    Post Thanks / Like

    Default

    Quote Originally Posted by huskerdont View Post
    At the new Glebe Road Bridge, note also that westbound they got the ADA ramp a bit wrong and you could easily flat if you weren't careful. It's not as bad as the East Basin Drive ramp in DC.

    I just got an email from the ArCo project manager who said "We are aware of the issue and it will be an item for the punchlist."

  10. Likes Starduster, Judd liked this post
  11. #528
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,378
    Post Thanks / Like

    Default

    Quote Originally Posted by Starduster View Post
    OK fellow lumberjacks: What do we do now?
    It seems that some reverse-lumberjacking has occurred

    Click image for larger version. 

Name:	20230311_112817.jpg 
Views:	50 
Size:	97.6 KB 
ID:	30654

  12. Likes Starduster, Judd, Steve O liked this post
  13. #529
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    4,320
    Post Thanks / Like

    Default

    Quote Originally Posted by dbb View Post
    I just got an email from the ArCo project manager who said "We are aware of the issue and it will be an item for the punchlist."
    Thanks for e-mailing them. It was on my to do. The FoMVT storage unit is in Shirlington and we are hauling loaded down trailers over this curb and it would totally suck to have to unload and reload a trailer for a pinch flat on the way to an event.


    Sent from my iPhone using Tapatalk

  14. #530
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,378
    Post Thanks / Like

    Default

    Quote Originally Posted by Starduster View Post
    OK fellow lumberjacks: What do we do now?
    Just got an email from Dominion that said "Thanks for reaching out. We are working on fixing this issue as soon as possible."

    Their rep has been pretty responsive to me so I'm remaining positive.

  15. Likes Starduster liked this post

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •