    [I didn't see an earlier post on this, but admit I didn't go back through the entire thread, so apologies if this is a duplicate/rehash.]

    VDOT last month awarded the contract to build the Rosslyn Bike/Ped Improvements, originally designed by Arlington as the Lynn Street Esplanade and Custis Trail Improvements.

    Among other things, improvements include wider, ADA-compliant sidewalks and a bike lane on North Lynn from 19th St north to Lee Hwy, and a substantially wider Custis Trail (which is also twice as far from traffic!) between Lynn and Oak St.

    Click image for larger version. 

Name:	asset_upload_file335_123062.jpg 
Views:	126 
Size:	15.0 KB 
ID:	17808

    Work is to begin later this spring and is expected to be complete in spring 2020.

  2. Likes kwarkentien liked this post
  3. #342
    Join Date
    Mar 2011
    Location
    Columbia Pike
    Posts
    1,425
    Post Thanks / Like

    Default

    The Berkeley development along S Glebe Rd is finally breaking ground. As part of this project, the developer will be widening the stretch of Four Mile Run Trail behind the development from 8' to 12'.

  4. Likes lordofthemark, Guus, Judd liked this post
  5. #343
    Judd's Avatar
    Judd is online now I really need to log off the internet and go for a ride.
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    2,662
    Post Thanks / Like

    Default

    Quote Originally Posted by chris_s View Post
    The Berkeley development along S Glebe Rd is finally breaking ground. As part of this project, the developer will be widening the stretch of Four Mile Run Trail behind the development from 8' to 12'.
    Now if we could get some Met Branch type murals on that flood wall behind there, it would be just about perfect.


    Sent from my iPhone using Tapatalk

  6. Likes Erin Potter liked this post
  7. #344
    Join Date
    Sep 2017
    Location
    Brightwood, DC
    Posts
    15
    Post Thanks / Like

    Default

    Quote Originally Posted by infinitebuffalo View Post
    VDOT last month awarded the contract to build the Rosslyn Bike/Ped Improvements, originally designed by Arlington as the Lynn Street Esplanade and Custis Trail Improvements.…

    Work is to begin later this spring and is expected to be complete in spring 2020.
    Work is beginning! https://www.arlnow.com/2018/06/07/co...on-in-rosslyn/


    The Virginia Department of Transportation announced that is starting work on the two-year, $9.3 million project this week.…

    Drivers can expect daytime and nighttime lane closures on southbound Lee Highway and North Lynn Street…. Bicyclists and pedestrians on the Custis Trail along southbound Lee Highway between North Lynn Street and North Oak Street can expect detours onto temporary paths around the work zone. Signs will notify bicyclists and pedestrians during these temporary configurations.
    (as an aside, I'm still amused that VDOT refers to Lee Hwy as 'northbound' and 'southbound', based on the directions US-29 runs generally, despite the fact that Lee Highway runs east-west in its entirety...)

  8. #345
    Join Date
    Dec 2013
    Location
    Falls Church
    Posts
    2,293
    Post Thanks / Like

    Default

    There’s paint down for a new bike lane on Hilltop Rd in Merrifield, going westbound (uphill). It went in just today, but I don’t think that’s any excuse for the he cars I was driving along with all driving right through it as if it weren’t even there.

  9. Likes lordofthemark, dasgeh, kwarkentien liked this post

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •