    When I last rode up that way on March 30, the temporary bridge was blocking about half of the width of the bridge at the north end. The CCCT site doesn't have any update of when the work was going to be done. Can someone who rides that regualarly keep us updated as the work progresses? I know there was an earlier tread that mentioned this, but I can't find it now.

    Thanks

  2. #2
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    687
    Post Thanks / Like

    Default

    I rode on it last night. Currently, there's a wooden structure on the west end of the bridge that restricts traffic to one way passage.

  3. #3
    Join Date
    Jun 2012
    Location
    Silver Spring
    Posts
    579
    Post Thanks / Like

    Default

    The CCT site says the repairs will take until June