Page 2 of 2 FirstFirst 12
Results 11 to 15 of 15

Thread: new Anacostia Trail closure on Northeast Branch

  1. #11
    Join Date
    Feb 2011
    Location
    Greenbelt
    Posts
    2,174
    Post Thanks / Like

    Default

    Appears some naughty folk threw the trail closed sign in the river...

    Name:  NE Branch trail not so closed as before.jpg
Views: 69
Size:  93.9 KB

  2. #12
    Join Date
    May 2012
    Location
    Bethesda, MD
    Posts
    903
    Post Thanks / Like

    Default

    Not so easy to walk around the construction anymore. It's "barricaded" off, but that probably won't last long. Still, it's going to be more precarious to transition from the pavement to the construction.


    003 by certifried, on Flickr

  3. #13
    Join Date
    Feb 2011
    Location
    Greenbelt
    Posts
    2,174
    Post Thanks / Like

    Default

    Repaving is almost done on the stretch between Decatur and Riverdale Road. Only a couple small sections up close to Riverdale road are still dirt.

  4. #14
    Join Date
    Feb 2011
    Location
    Greenbelt
    Posts
    2,174
    Post Thanks / Like

    Default NE Branch trail now open between Decatur Street and Riverdale Road

    The short section between south of Decatur down toward the railroad bridge is still closed, but they were working on it this morning -- hopeful we'll be back to normal soon!

    http://app.strava.com/rides/21143845

  5. #15
    Join Date
    Jul 2012
    Posts
    1,284
    Post Thanks / Like

    Default

    We can take to the river tomorrow on the group ride. It's shallow and an easy portage.

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •