Holmes Run Trail - bridge behind 4600 Duke Strret
The abutments for Holmes Run Trail Bridge at 4600 Duke have been completed. The contractor has been cleaning up the site. According to contractor staff, the replacement bridge is expected to be installed on October 5, 2023.


Last edited by CaseyKane50; 06-16-2023 at 10:51 AM.
Reason: Corrected address
-
Post Thanks / Like - 1 Likes, 0 Dislikes, 0 ELITE
-
Enough riprap to build a jetty from here to the Moon. Maybe this one will be more flood-resilient.
-
Post Thanks / Like - 2 Likes, 0 Dislikes, 0 ELITE
-

Originally Posted by
CaseyKane50
Finally. Thank you Alexandria.
Any updates on the washed out bridges further upstream?
-

Originally Posted by
Starduster
Finally. Thank you Alexandria.
Any updates on the washed out bridges further upstream?
From the project website.
- Holmes Run Trail at Dora Kelly Park - TBD (likely winter 2026) project will be coordinated with the design of a new bridge crossing to replace current fair weather crossing
- Holmes Run Trail Bridge at Morgan Street cul-de-sac - anticipated start fall 2023, completion fall 2024
- Holmes Run Trail Bridge at Ripley Street - anticipated start fall 2023, completion fall 2024
-
Post Thanks / Like - 2 Likes, 0 Dislikes, 0 ELITE
-
Talked to a contractor staff person at the project site this morning, bridge is expected to open by July 31.


-
Post Thanks / Like - 2 Likes, 0 Dislikes, 0 ELITE
-
Bridge was open as of 1 PM today (when I walked across it)
-
Post Thanks / Like - 4 Likes, 0 Dislikes, 0 ELITE
-
I rode across the bridge yesterday for the first time and it was great not to have to jump the curb to take the detour through the condo parking lot.
Last edited by Boomer2U; 09-08-2023 at 12:22 PM.
Reason: Trying to right-side the photo attachment
-
Post Thanks / Like - 5 Likes, 0 Dislikes, 0 ELITE