Thread: W&OD Construction Between Mile Markers 14 and 14.5

  1. #1
    Join Date
    Mar 2012
    Location
    Vienna
    Posts
    90
    Post Thanks / Like

    Default W&OD Construction Between Mile Markers 14 and 14.5

    Currently, the detour is almost exactly 0.2 mile. Much of the surface is packed, but there is loose gravel in places. I had to slow down on my road bike to avoid spilling, but a mountain bike would have no trouble. It was dry when I rode over the detour today; it is going to be a mess when it rains. At least 1/2 mile of the W&OD needs to be shored up. I am not how the work is going to proceed: will they finish the current segment, reopen the W&OD there, then start a new segment? Or, are they going to close more of the trail and work on the whole are that needs to be shored up all at once? I just hope it doesn't take a year to finish.Name:  IMG_0700.jpg
Views: 58
Size:  93.8 KB
    Last edited by JimK; 04-11-2012 at 01:15 PM.

  2. #2
    mstone is offline I really need to log off the internet and go for a ride.
    Join Date
    Jun 2011
    Posts
    2,399
    Post Thanks / Like

    Default

    Glad I found out about it here before going that way; the gravel would really annoy me right in the quiet stretch where you can finally speed up a bit.