Likes Likes:  8
Dislikes Dislikes:  0
ELITE ELITE:  0
Page 2 of 3 FirstFirst 123 LastLast
Results 11 to 20 of 21

Thread: August 2022 Road and Trail Conditions

  1. #11
    Join Date
    Jul 2015
    Location
    Arlington, VA
    Posts
    651
    Post Thanks / Like

    Default

    Quote Originally Posted by consularrider View Post
    Wasn't there at 4:30 Friday. Not much going on at the Kensington crossing. The west-side caution tapes at all three barriers between Kensington and Jefferson had been broken.

    Click image for larger version. 

Name:	IMG_4895[1].jpg 
Views:	50 
Size:	97.7 KB 
ID:	29102
    So the tool to tell the county about trees works. (or someone called it in)

  2. #12
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,385
    Post Thanks / Like

    Default

    Crystal City Connector at the Water Park was a shit show this afternoon. The contractor dug a trench across the ramp down to the tunnel. Gotta love this stuff.

    Click image for larger version. 

Name:	20220815_144014.jpg 
Views:	59 
Size:	97.8 KB 
ID:	29103

    Click image for larger version. 

Name:	20220815_143721.jpg 
Views:	56 
Size:	97.2 KB 
ID:	29104

    I logged a service ticket with Arlington. Remains to be seen what happens.

  3. #13
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,385
    Post Thanks / Like

    Default

    Inspection at noon today shows no real improvement. Developer is aware and is working to get trail reopened. Some in ArCo seem to feel that MOT allowed a "walk your bike" segment
    Click image for larger version. 

Name:	20220816_120355.jpg 
Views:	54 
Size:	96.3 KB 
ID:	29105

    Click image for larger version. 

Name:	20220816_120511.jpg 
Views:	55 
Size:	97.2 KB 
ID:	29106

    Click image for larger version. 

Name:	20220816_120304.jpg 
Views:	58 
Size:	95.2 KB 
ID:	29107

  4. #14
    Join Date
    Nov 2019
    Location
    Arlington
    Posts
    201
    Post Thanks / Like

    Default

    Ridiculous if the county pre-approved this. I get the feeling there's just an "anything goes" attitude when it comes to work associated with "National Landing."

    I've submitted several tickets about steel plates covering utility trenches on Crystal Drive south of 18th. They're often placed at odd angles to the direction of travel, not spiked down, and there are no asphalt edge "ramps." All at odds with best practices. Several times I've noted multiple plates stacked. Easy enough to spot during the day I suppose, but a hazard for the unwary, those riding at night, or in the rain.

  5. Likes Steve O liked this post
  6. #15
    Join Date
    Feb 2010
    Location
    Dominion Hills, Arlington
    Posts
    6,614
    Post Thanks / Like

    Default

    On the goods news front, upgrades to facilities along the W&OD. New non-"winterized" water fountain with bottle filler at Smith Switch, several new porta-johns, and new mirrors at mm 33 on either side of the Leesburg Bypass underpass giving a pretty clear view of what's been hiding under there all these years. Now, how about for the Carling Springs Underpass along 4 Mile Run?

    Click image for larger version. 

Name:	IMG_4937[1].jpg 
Views:	64 
Size:	96.5 KB 
ID:	29109

  7. #16
    Join Date
    Feb 2010
    Location
    Dominion Hills, Arlington
    Posts
    6,614
    Post Thanks / Like

    Default

    W&OD closed at Custis intersection. Short trail repair section at the 4MR bridge just east. Detour up Custis and around Bon Air.

    Click image for larger version. 

Name:	IMG_4944[1].jpg 
Views:	45 
Size:	100.8 KB 
ID:	29110

  8. #17
    Join Date
    Feb 2010
    Location
    Dominion Hills, Arlington
    Posts
    6,614
    Post Thanks / Like

    Default

    They're making progress in Bon Air Park. Trail opened up outside of working hours.

    Click image for larger version. 

Name:	IMG_4945[1].jpg 
Views:	45 
Size:	96.8 KB 
ID:	29111

  9. #18
    Join Date
    Apr 2017
    Location
    DC
    Posts
    162
    Post Thanks / Like

    Default

    Any updates when the Rock Creek tunnel bypass is going to open? I thought it was supposed to open by end of July but can't find any updates anywhere.

  10. #19
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    4,343
    Post Thanks / Like

    Default

    Quote Originally Posted by Smitty2k1 View Post
    Any updates when the Rock Creek tunnel bypass is going to open? I thought it was supposed to open by end of July but can't find any updates anywhere.
    I saw on Twitter somewhere that it was delayed because of a supply issue with the railings. Someone posted a picture yesterday showing the railing being installed, so it should hopefully be soon.

  11. Likes Steve O, huskerdont liked this post
  12. #20
    Join Date
    Feb 2010
    Location
    Dominion Hills, Arlington
    Posts
    6,614
    Post Thanks / Like

    Default

    Quote Originally Posted by consularrider View Post
    They're making progress in Bon Air Park. Trail opened up outside of working hours.

    Click image for larger version. 

Name:	IMG_4945[1].jpg 
Views:	45 
Size:	96.8 KB 
ID:	29111
    Trail work was done by Thursday evening.

    Click image for larger version. 

Name:	IMG_4948[1].jpg 
Views:	42 
Size:	95.6 KB 
ID:	29112

  13. Likes chris_s, Steve O liked this post

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •