Thread: Bridge out on Wayne Andersen Bikeway (IE the trail in 4MR park in Alexandria)

  1. #21
    Join Date
    Aug 2011
    Location
    Alexandria, VA
    Posts
    884
    Post Thanks / Like

    Default

    From the City’s web page

    https://www.alexandriava.gov/tes/inf...aspx?id=123842

    In Summer 2021, it was observed during a field inspection that a hole had formed in the Four Mile Run Park Trail bridge deck. After a follow-up structural inspection, it was determined that the condition of the bridge was not suitable for use by people driving, biking, or walking. To ensure the safety of trail users, the bridge was closed in August 2021. Based on the latest inspection, the bridge condition is rated as “poor” due to structural deficiencies in the decking and beams.
    Detour Information

    Temporary detour signs have been installed on the trail to assist trail users in reaching their destinations. Additional signage is under development and expected to be in place by September 2021. A map showing the detour routes is below. Trail users should follow the Four Mile Run Wetland Trail during the daytime. Trail users should follow the provided on-street route during nighttime when the Wetland Trail is not lit.


    Due to the emergency nature of the bridge closure, repair/replacement of the bridge is not currently funded. However, staff is requesting funding for this project for the City’s Fiscal Year 2023 budget.
    Last edited by CaseyKane50; 09-27-2021 at 05:46 PM. Reason: Added additional details

  2. Likes CBGanimal, Steve O, bentbike33 liked this post
  3. #22
    Join Date
    May 2010
    Location
    Pentagon City in Arlington VA
    Posts
    5,500
    Post Thanks / Like

    Default

    due to the emergency nature of the bridge closure, repair/replacement of the bridge is not currently funded. However, staff is requesting funding for this project for the city’s fiscal year 2023 budget.
    Closed for several years, then, evidently.


  4. #23
    Join Date
    Mar 2011
    Location
    Columbia Pike
    Posts
    1,557
    Post Thanks / Like

    Default

    Quote Originally Posted by CaseyKane50 View Post
    Due to the emergency nature of the bridge closure, repair/replacement of the bridge is not currently funded. However, staff is requesting funding for this project for the City’s Fiscal Year 2023 budget.
    Alexandria advocates may want to suggest that this would be a good use for Alexandria's upcoming piece of American Rescue Plan Act funding.

  5. #24
    Join Date
    Sep 2013
    Location
    Alexandria
    Posts
    868
    Post Thanks / Like

    Default

    Quote Originally Posted by Steve O View Post
    Closed for several years, then, evidently.
    Not necessarily -- we're in FY 2022 now and FY 2023 begins next July. If the City is willing & able to spend money on design before FY 2023, we could be looking at "just" one year of complete closure. If they're making a request they must at least have a ballpark estimate for replacement cost; anybody know what the estimated cost is? And if they will spend money on design work this fiscal year?

    More good news for folks on bikes: the City seems to be mowing "shoulders" beside the wetland path now, which makes it feel less cramped (though also less natural). There's enough light from Arlington across 4 Mile Run that cheap "city" lights are generally adequate after dark although, as I've noted, some Recreation and Police staff seem to think the 10pm citywide park closing time also applies to the paved paths inside 4MR park.