    Some shots from today. Work was occurring, apparently to lower the utility boxes to grade. As can be seen, the turn for the current detour continues to challenge the construction team (and their vehicles) as well as cyclists.


    Click image for larger version. 

Name:	20200928_124539.jpg 
Views:	65 
Size:	95.1 KB 
ID:	21696

    Click image for larger version. 

Name:	20200928_124525.jpg 
Views:	68 
Size:	97.7 KB 
ID:	21697

    The second photo show the geometry failure. Instead of having cyclists heading east executing a 90 degree left turn with a clean (straight) exit entering the underpass under I-66, the current approach is going about 135 degrees around the circle and then a right turn off the trail to the underpass. For that right turn, cyclists would need to avoid the fire hydrant.

    I fear my concerns will play out when the underpass reopens.
    Last edited by dbb; 09-28-2020 at 08:20 PM.

  2. #32
    Join Date
    Jun 2015
    Location
    Southwest DC
    Posts
    347
    Post Thanks / Like

    Default

    Quote Originally Posted by bentbike33 View Post
    So that’s why they built the little trail extension on the east side of Sandburg St. to Iliff Dr.
    Did they also build an extension along Gallows? That seems more important than Sandburg. I can see from the tweet that they have made a bike lane along Iliff and put every bollard in northern VA to use.

    Edit: Never mind. It is all explained here https://www.novaparks.com/parks/wash...sandburg-st-to.
    Last edited by ursus; 09-29-2020 at 04:42 AM.

  3. Likes bentbike33 liked this post
  4. #33
    Join Date
    Jun 2017
    Location
    Arlington
    Posts
    222
    Post Thanks / Like

    Default

    Quote Originally Posted by ursus View Post
    Did they also build an extension along Gallows? That seems more important than Sandburg. I can see from the tweet that they have made a bike lane along Iliff and put every bollard in northern VA to use.

    Edit: Never mind. It is all explained here https://www.novaparks.com/parks/wash...sandburg-st-to.
    It would be nice if some of these “temporary” trails could just be made permanent, even if they are simply connectors into the W&OD in the future.

  5. #34
    Join Date
    Sep 2015
    Location
    Riverdale, MD
    Posts
    577
    Post Thanks / Like

    Default

    Quote Originally Posted by ursus View Post
    Did they also build an extension along Gallows? That seems more important than Sandburg. I can see from the tweet that they have made a bike lane along Iliff and put every bollard in northern VA to use.

    Edit: Never mind. It is all explained here https://www.novaparks.com/parks/wash...sandburg-st-to.
    Nope- Gallows is still pretty garbagey as far as bike lanes go. It’s such a missed opportunity to build and “urban style mixed use development” in Merrifield, but not have the urban multi-modal connectivity to make it really engaging and vibrant. Who else loves crossing 29 by bike???

  6. #35
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,315
    Post Thanks / Like

    Default

    For those who haven't been out the W&OD, be advised that the bike/ped overpass is progressing nicely. VDOT says the bridge (less landscaping and improvements below the bridge) will be done in Fall 2020.

    A couple of pics from today

    Click image for larger version. 

Name:	20200930_101924.jpg 
Views:	51 
Size:	97.1 KB 
ID:	21698
    The east end of the bridge

    Click image for larger version. 

Name:	20200930_114224.jpg 
Views:	51 
Size:	94.3 KB 
ID:	21699
    The west end of the bridge

    Click image for larger version. 

Name:	20200930_102210.jpg 
Views:	53 
Size:	95.5 KB 
ID:	21700
    A park bench along the trail, with a nice setback to reduce conflicts

  7. Likes kwarkentien, ursus, Starduster, Relwal Noj liked this post
  8. #36
    Join Date
    Feb 2011
    Location
    Crystal City to L'Enfant Plaza
    Posts
    2,315
    Post Thanks / Like

    Default

    The PBL along 4th SW/NW is progressing. Now partially complete on both sides.

    Click image for larger version. 

Name:	20200930_082714.jpg 
Views:	51 
Size:	95.5 KB 
ID:	21701

  9. Likes kwarkentien, ursus, Starduster liked this post
  10. #37
    Join Date
    Dec 2017
    Location
    Riverdale Park, MD
    Posts
    169
    Post Thanks / Like

    Default

    PG Parks reopened the bridge on the NE Branch of the Anacostia Tributary Trail in Riverdale Park. Thank you to Greenbelt for the update.

    Neighbors said the reason PG Parks estimated it would take up to a year to replace the bridge was from plans to replace it with a design that would be less prone to future flood damage and to have it connect at street level.

    I'm happy that it's reopened and hopeful we'll see a better bridge in a year or so.

  11. Likes kwarkentien liked this post
  12. #38
    Join Date
    Jun 2015
    Location
    Southwest DC
    Posts
    347
    Post Thanks / Like

    Default

    Quote Originally Posted by dbb View Post
    The PBL along 4th SW/NW is progressing. Now partially complete on both sides.

    Click image for larger version. 

Name:	20200930_082714.jpg 
Views:	51 
Size:	95.5 KB 
ID:	21701
    I hope that they remember to repave and paint from G St SW to the freeway when the construction on the east side is finished. Now the rest of 4th Street makes this block seem even more jarring than it used to seem.

  13. #39
    Join Date
    Jun 2017
    Location
    Arlington
    Posts
    222
    Post Thanks / Like

    Default

    Quote Originally Posted by ursus View Post
    Another W&OD detour https://twitter.com/WODTrail/status/1310619472672284672

    Starting on or around October 5th, Dominion Energy will begin performing major line work along the trail between Sandburg St and Gallows Rd in the Dunn Loring area. The construction is expected to continue well into next year and will require a detour of the trail onto Iliff Dr.
    I just went through here this past weekend and this detour really frustrates me. The detour path is actually really good, clearly separated from traffic with dense flex posts, and properly marked. If this can be put down for a utility project in little time without complaint, I can't understand why this can't be built on every road to this standard where right of way exists. Seriously, this detour shows how much the development process is broken and takes way too long.