Thread: Small Custis Trail Project - Starts July 20

  1. #1
    Join Date
    Apr 2012
    Location
    Arlington
    Posts
    330
    Post Thanks / Like

    Default Small Custis Trail Project - Starts July 20

    Sharing from County DES:

    To improve safety on the trail and streets in the Westover neighborhood, Arlington County will install a curb ramp, mark a crosswalk and add supporting signage and markings across from the existing Custis trailhead on Fairfax Drive between N Kennebec Street and N Kensington Street.

    Name:  Custis Trail Image.jpg
Views: 185
Size:  20.3 KB
    Site location map (Imagery from Google Maps)

    Construction is expected to begin the week of July 20th. Work hours will generally be 8 am to 2 pm, Monday through Friday, but you may see crews setting up starting at 7 am. You may experience inconveniences during construction such as pedestrian detours near the trailhead and temporary parking restrictions. Road users may encounter a lane closure, but access to Fairfax Drive should otherwise remain open. This construction is expected to take roughly one week, weather permitting.

    More information on the upcoming work:

    The Custis trailhead currently exits onto the south side of Fairfax Drive, where there is no sidewalk. There is sidewalk on the north side of the street, but there is not a curb ramp or crosswalk to facilitate access to the trail. The current condition presents issues of safety, visibility and awareness for trail and road users alike.

    Arlington County will add a curb ramp to the north side of Fairfax Drive, mark a crosswalk and add supporting signage and markings to facilitate safer trail access.
    The plan is available for review online.

    Henry

  2. #2
    Join Date
    Feb 2010
    Location
    Now mostly Manhattan (NYC) with time in Dominion Hills
    Posts
    5,742
    Post Thanks / Like

    Default

    How will this impact the already existing Custis detour that uses the I-66 pedestrian overpass there? Can they fill in the separation gap between the concrete slabs at the very north end of the bridge?

  3. Likes Sunyata, Steve O liked this post
  4. #3
    Join Date
    Aug 2012
    Location
    Falls Church
    Posts
    429
    Post Thanks / Like

    Default

    That's the "I missed the Detour sign" path? Should be helpful in the dark

  5. #4
    Join Date
    Nov 2019
    Location
    Westover
    Posts
    13
    Post Thanks / Like

    Default

    I use this crossing all the time and think this will be a huge improvement for both vehicles and bikes/peds. Neither can see each other at all due to the trees/brush and parked cars. Also, drivers have no idea to expect trail users to cross here because there's no signage or visual clues indicating there's a major trailhead at this mid-block location.

  6. Likes secstate, Sunyata, Steve O liked this post

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •