Thread: Boundary Channel Drive Trail Connection Meeting - 12/5/19

  1. #1
    Judd's Avatar
    Judd is offline I really need to log off the internet and go for a ride.
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    3,764
    Post Thanks / Like

    Default Boundary Channel Drive Trail Connection Meeting - 12/5/19

    Meeting on Thursday, 12/5 to present the concept for the Boundary Channel Drive interchange project. The project includes an addition of a trail segment connecting to the Mount Vernon Trail.

    There are some ramp crossings that likely are going to need lots of feedback based on our experience with other ramp crossings in Arlington.

    Hope to see you there. Maybe a beer afterwards with my bikey friends?

    Thursday, December 5
    4:30 6:30 pm
    251 18th Street S.
    Arlington, VA 22202

    Project page:
    https://projects.arlingtonva.us/proj...e-interchange/


    Sent from my iPhone using Tapatalk

  2. #2
    dasgeh's Avatar
    dasgeh is offline Queen of Family Biking & All Things Kidical
    Join Date
    Aug 2011
    Posts
    5,758
    Post Thanks / Like

    Default

    Quote Originally Posted by Judd View Post
    251 18th Street S.
    For those wondering where this is (and too lazy to Google), it's a block due west of the Crystal City end of the Crystal City Connector.