    Default Construction around Kennedy Center

    Does anyone know if the crane work is still blocking the Rock Creek connection between the Lincoln Memorial and Water St in Georgetown?

  2. #12
    Join Date
    Feb 2013
    Posts
    160
    Post Thanks / Like

    Default

    Its' back open, but also back on the cobblestone path.

  3. #13
    Join Date
    Jun 2015
    Location
    Southwest DC
    Posts
    284
    Post Thanks / Like

    Default

    I rode on the W&OD trail today. They are repaving west of Ashburn. The horse path was so bad I gave up. Does anyone know how far it is being repaved (probably to the place they repaved a year or so ago) and when it will reopen?
    Last edited by ursus; 05-16-2019 at 04:11 PM.

  4. #14
    Join Date
    Mar 2014
    Location
    VA
    Posts
    418
    Post Thanks / Like

    Default

    Quote Originally Posted by ursus View Post
    I rode on the W&OD trail today. They are repaving west of Ashburn. The horse path was so bad I gave up. Does anyone know how far it is being repaved (probably to the place they repaved a year or so ago) and when it will reopen?
    Scroll down to "Latest updates" here. Quote:

    Beginning on or around May 13 the section of trail from Cochran Mill Road to Ashburn Road will be repaved (mile marker 30.5 to 27.5 approximately). Whenever possible trail users will be detoured onto the horse trail. The park staff have cleared back the vegetation and the contractor will regrade the horse trail. The work is expected to take about one week to complete. Please use caution in this area and observe construction signs in the work zone.

  5. #15
    Join Date
    Jun 2015
    Location
    Southwest DC
    Posts
    284
    Post Thanks / Like

    Default

    Quote Originally Posted by n18 View Post
    Scroll down to "Latest updates" here. Quote:
    Thanks greatly. I should have looked at that website.

    IMHO, the detour to the horse trail was far from good. It was full of deep ruts, mud, and piles of horse poop. In other places, I have been able to use it.
    Last edited by ursus; 05-17-2019 at 02:37 PM.

  6. #16
    Join Date
    Jun 2015
    Location
    Southwest DC
    Posts
    284
    Post Thanks / Like

    Default

    They have essentially finished repaving between Ashburn Road and Cochran Mill Road. The center line probably won't be added for several months as happened in the section directly west of this.