Likes Likes:  22
Dislikes Dislikes:  0
ELITE ELITE:  0
Page 2 of 2 FirstFirst 12
Results 11 to 16 of 16

Thread: County Board to Consider Bicycle Element Update for Approval on April 23

  1. #11
    dasgeh's Avatar
    dasgeh is offline Queen of Family Biking & All Things Kidical
    Join Date
    Aug 2011
    Posts
    5,789
    Post Thanks / Like

    Default

    Quote Originally Posted by sjclaeys View Post
    How long are we going to stay at this "step"? The fixation with just building bicycle-specific infrastructure is like responding to burglaries by only buying people bigger locks and stronger doors.
    Huh? This plan has a WHOLE LOT MORE than just infrastructure changes. In fact, it's all of those policies and action items that we think are good. We primarily want the projects strengthened.

    I encourage you to read it. https://commissions.arlingtonva.us/p...working-group/

  2. Likes Steve O, lordofthemark liked this post
  3. #12
    Join Date
    Sep 2013
    Location
    Alexandria
    Posts
    881
    Post Thanks / Like

    Default

    So, what was the outcome?

  4. Likes Judd liked this post
  5. #13
    Join Date
    Dec 2014
    Location
    Washington, DC
    Posts
    21
    Post Thanks / Like

    Default

    Arlington County Board approved updates to the Master Transportation Plan’s Bicycle Element to make Arlington a place where all person can feel safe and comfortable while biking for transportation. Read full plan here:bit.ly/ArlingtonMTP

  6. Likes Judd, dasgeh liked this post
  7. #14
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    4,354
    Post Thanks / Like

    Default

    Also will add that the plan was adopted with the edits called for through the advocacy campaign, most notably the requirement to use NACTO standards for a low stress bicycle facility when doing projects. The previous language was very soft requirement to provide enhanced facilities which allowed too much discretion to slap sharrows down in an inappropriate area and call it an enhancement.


    Sent from my iPhone using Tapatalk

  8. #15
    dasgeh's Avatar
    dasgeh is offline Queen of Family Biking & All Things Kidical
    Join Date
    Aug 2011
    Posts
    5,789
    Post Thanks / Like

    Default

    Quote Originally Posted by ReneeYvonne View Post
    Arlington County Board approved updates to the Master Transportation Plan’s Bicycle Element to make Arlington a place where all person can feel safe and comfortable while biking for transportation. Read full plan here:bit.ly/ArlingtonMTP
    That link isn't updated. In fact, I haven't seen the version of the Bike Element that was adopted (i.e. with the changes made at the dias). Any idea when that will be up?

  9. #16
    Join Date
    Apr 2012
    Location
    Arlington
    Posts
    447
    Post Thanks / Like

    Default

    Quote Originally Posted by dasgeh View Post
    That link isn't updated. In fact, I haven't seen the version of the Bike Element that was adopted (i.e. with the changes made at the dias). Any idea when that will be up?
    Ritch told me they were making sure they got the amendments correct and would be publishing soon. I poke him again.

    Henry

  10. Likes Judd, dasgeh, Pinking liked this post

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •