    Default More Rock Creek Park trail construction coming

    From WashCycle:

    Widening and resurfacing of the Rock Creek Park Trail between P Street and Tilden, including construction of a new segment along Piney Branch and a new bridge south of the Zoo tunnel, is going out to bid soon, with construction expected to begin in Fall 2018. Detour information can be found here.
    The project has been broken into seven stages, starting at the south end and working north. The big impact will be Stage 2, when the trail between P Street and Calvert Street will be closed for four months.

  2. #2
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    290
    Post Thanks / Like

    Default

    A public meeting about the final stage of the Beach Drive rehabilitation is being held in Silver Spring on May 15, from 7-8 pm

    The National Park Service (NPS) invites residents, drivers, and trail users to an informational meeting about what we've accomplished so far as well as new construction. Since this project will temporarily close part of Beach Drive and some trails to all use, we will also share detours around the work area, which is between Joyce Road NW and the Maryland-District of Columbia border. We will host the meeting on May 15, 2018 from 7 p.m. to 8 p.m. Plan to attend at the:

    Silver Spring Library
    Small Rooms 1 & 2 (third floor)
    900 Wayne Avenue
    Silver Spring, MD 20910

    Check the Silver Spring Library website for information about transit options including bus, Metro, and parking. To request specific accommodations, like a sign language interpreter, please contact Jonathan Shafer at e-mail us or (202) 619-7186 by Wednesday, May 9. Join representatives from the NPS, Federal Highway Administration (FWHA), District Department of Transportation (DDOT), and DC Water who can answer questions about the rehabilitation of Beach Drive.
    Last edited by DCAKen; 05-11-2018 at 10:46 AM.

  3. #3
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    290
    Post Thanks / Like

    Default

    At last night's public meeting, the project manager announced that Segment 3 (Broad Branch to Joyce) of Beach Drive will be finished a little earlier than expected and the last phase of the project (Joyce to the Maryland line) will be begin in mid-July. Beach Drive (and the trail from Joyce to Bingham) will be closed to all traffic, with the designated detour for pedestrians and cyclists to be the trail along Oregon Ave. Ross Drive and Ridge Road will be reopened to cars at this time. The short segment of Beach Drive from Wise Road to West Beach Drive will remain open for about six months to provide cut-through access, but this will be closed somewhere around January. Wise Road will also be closed, but it will not be rehabilitated. This final phase of the project is estimated to take about a year.

  4. #4
    Join Date
    Jan 2011
    Location
    R and 15th NW DC
    Posts
    62
    Post Thanks / Like

    Default

    Quote Originally Posted by DCAKen View Post
    At last night's public meeting, the project manager announced that Segment 3 (Broad Branch to Joyce) of Beach Drive will be finished a little earlier than expected and the last phase of the project (Joyce to the Maryland line) will be begin in mid-July. Beach Drive (and the trail from Joyce to Bingham) will be closed to all traffic, with the designated detour for pedestrians and cyclists to be the trail along Oregon Ave. Ross Drive and Ridge Road will be reopened to cars at this time. The short segment of Beach Drive from Wise Road to West Beach Drive will remain open for about six months to provide cut-through access, but this will be closed somewhere around January. Wise Road will also be closed, but it will not be rehabilitated. This final phase of the project is estimated to take about a year.
    How is that trail next to Oregon Ave? From G-View it looks heavily forested, not at all suitable for two wheels except for MTBs. Oregon Avenue is not suitable either, as it has no shoulders and is very narrow with limited sightlines. At least the District thought to put all-way stops on those intersections to avoid having it turn into a speedway.

  5. #5
    Join Date
    Feb 2014
    Location
    MoCo
    Posts
    955
    Post Thanks / Like

    Default

    I used to ride it as a kid. It's unsafe at speeds much above a brisk jog, with lots of roots, off camber hairpin turns and trees right next to the narrow path.

  6. #6
    Join Date
    May 2013
    Location
    Washington, DC
    Posts
    42
    Post Thanks / Like

    Default

    Agree, the trail is not great there - I prefer riding on Oregon Ave.

  7. #7
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    290
    Post Thanks / Like

    Default

    Electronic signs in Rock Creek Park are now showing Beach Drive from Joyce Road to the DC line will be closed on July 6 as the last phase of the project starts. The short segment between Wise and West Beach Drive will remain open for a couple of months.

  8. #8
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    290
    Post Thanks / Like

    Default

    The latest word from DDOT is that work on rehabilitating the remaining portions of the Rock Creek Trail won't be starting until Spring 2019.

  9. #9
    Join Date
    Jan 2012
    Location
    Arlington VA
    Posts
    149
    Post Thanks / Like

    Default

    Does anybody know the current ability to ride Rock Creek on weekends. I have been on it about 3 times but led by another rider so I am not familiar. I want to be able to take two friends on a 17-25 mile ride starting at say the nature center and ending there. If anybody can help with a ride map with the current construction that would be outstanding.