Page 2 of 2 FirstFirst 12
Results 11 to 13 of 13

Thread: December 2017 Road and Trail Conditions

  1. #11
    Join Date
    Apr 2014
    Location
    Arlington, VA
    Posts
    107
    Post Thanks / Like

    Default

    Quote Originally Posted by Erin Potter View Post
    W&OD Trail Work - Soil borings near Sparrow Pond
    From my inbox:
    "Between 12/14 and 12/22, a contractor for DES will be doing some soil borings near the Sparrows Pond stormwater facility. There will be a trail detour in effect while they are doing the soil borings. Because there are two parallel trails there, the detour should not be a major inconvenience for users."

    Looks like W&OD will be closed at times, which will route trail users onto the Four Mile Run Trail. At different times, it looks like the Four Mile Run Trail will be closed, which will route trail users onto the W&OD.
    W&OD Detour:
    Click image for larger version. 

Name:	Trailwork.jpg 
Views:	51 
Size:	111.7 KB 
ID:	15849

    PDFs of both Planned Trail Detours
    MOT_Exhibit1-WOD_v3.pdf
    MOT_Exhibit2-FMR_v3.pdf
    UPDATE for this construction: Now happening 12/26 through 1/5.

  2. Likes Arlingtonrider liked this post
  3. #12
    Join Date
    Apr 2014
    Location
    Arlington, VA
    Posts
    107
    Post Thanks / Like

    Default

    Quote Originally Posted by Erin Potter View Post
    W&OD Trail Work - Soil borings near Sparrow Pond
    From my inbox:
    "Between 12/14 and 12/22, a contractor for DES will be doing some soil borings near the Sparrows Pond stormwater facility. There will be a trail detour in effect while they are doing the soil borings. Because there are two parallel trails there, the detour should not be a major inconvenience for users."

    Looks like W&OD will be closed at times, which will route trail users onto the Four Mile Run Trail. At different times, it looks like the Four Mile Run Trail will be closed, which will route trail users onto the W&OD.
    W&OD Detour:
    Click image for larger version. 

Name:	Trailwork.jpg 
Views:	51 
Size:	111.7 KB 
ID:	15849

    PDFs of both Planned Trail Detours
    MOT_Exhibit1-WOD_v3.pdf
    MOT_Exhibit2-FMR_v3.pdf
    UPDATE for this construction: Now happening 12/26 through 1/5.

  4. #13
    Join Date
    Apr 2014
    Location
    Arlington, VA
    Posts
    107
    Post Thanks / Like

    Default

    Quote Originally Posted by Erin Potter View Post
    W&OD Trail Work - Soil borings near Sparrow Pond
    From my inbox:
    "Between 12/14 and 12/22, a contractor for DES will be doing some soil borings near the Sparrows Pond stormwater facility. There will be a trail detour in effect while they are doing the soil borings. Because there are two parallel trails there, the detour should not be a major inconvenience for users."

    Looks like W&OD will be closed at times, which will route trail users onto the Four Mile Run Trail. At different times, it looks like the Four Mile Run Trail will be closed, which will route trail users onto the W&OD.
    W&OD Detour:
    Click image for larger version. 

Name:	Trailwork.jpg 
Views:	51 
Size:	111.7 KB 
ID:	15849

    PDFs of both Planned Trail Detours
    MOT_Exhibit1-WOD_v3.pdf
    MOT_Exhibit2-FMR_v3.pdf
    UPDATE: The timeline on this work is now 12/26 through 1/5.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •