Likes Likes:  162
Dislikes Dislikes:  0
ELITE ELITE:  4
Page 3 of 18 FirstFirst 1234513 ... LastLast
Results 21 to 30 of 173

Thread: Maine Avenue is Combat

  1. #21
    Join Date
    Jun 2015
    Location
    Southwest DC
    Posts
    306
    Post Thanks / Like

    Default

    Last edited by ursus; 10-04-2017 at 04:09 AM.

  2. #22
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    315
    Post Thanks / Like

    Default

    That is an ambitious goal of six figure daily riders

  3. #23
    Join Date
    Jun 2016
    Location
    Washington DC
    Posts
    707
    Post Thanks / Like

    Default

    Quote Originally Posted by DCAKen View Post
    That is an ambitious goal of six figure daily riders
    Not once we have 20,000 LimeBikes...

  4. #24
    Judd's Avatar
    Judd is offline I really need to log off the internet and go for a ride.
    Join Date
    Sep 2015
    Location
    Arlington
    Posts
    3,706
    Post Thanks / Like

    Default

    Quote Originally Posted by DCAKen View Post
    That is an ambitious goal of six figure daily riders
    They're preparing for me to ferry over from Hains Points to do Maine Avenue PBL loops.

  5. #25
    Join Date
    Dec 2015
    Location
    Springfield VA
    Posts
    26
    Post Thanks / Like

    Default

    Awesome I also deal with Maine daily so difficult

  6. #26
    Steve O's Avatar
    Steve O is offline I spend all day thinking about bikes and talking to people on the internet about them.
    Join Date
    May 2010
    Location
    Pentagon City in Arlington VA
    Posts
    4,847
    Post Thanks / Like

    Default

    Quote Originally Posted by DCAKen View Post
    That is an ambitious goal of six figure daily riders
    It looks like the bike-ometer in Rosslyn, which shows daily numbers up top, monthly numbers below and the annual number as a bar rising from the bottom. That's what the 500,000 is showing - the annual number.

  7. #27
    TwoWheelsDC's Avatar
    TwoWheelsDC is offline I really need to log off the internet and go for a ride.
    Join Date
    Feb 2012
    Location
    Navy Yard
    Posts
    3,673
    Post Thanks / Like

    Default

    Nothing like dodging traffic while riding on milled pavement...at least it's an indicator that fresh asphalt is on the way.

  8. #28
    Join Date
    Sep 2011
    Location
    Dupont Circle
    Posts
    315
    Post Thanks / Like

    Default

    Quote Originally Posted by Steve O View Post
    It looks like the bike-ometer in Rosslyn, which shows daily numbers up top, monthly numbers below and the annual number as a bar rising from the bottom. That's what the 500,000 is showing - the annual number.
    I was noting that there are six LED numbers for the daily rider count. We'll need a few more lanes in the PBL for that.

  9. #29
    Join Date
    Mar 2015
    Location
    Falls Church, VA
    Posts
    1,009
    Post Thanks / Like

    Default

    Somehow they managed to make it worse this morning. I went over the top on Case Bridge so could not see all of what was happening below, but traffic was pouring up 9th to take the left to the Promenade making getting away from the Case Bridge difficult. I assume this means the westbound lanes of Maine were closed and 9th was the detour?

  10. #30
    TwoWheelsDC's Avatar
    TwoWheelsDC is offline I really need to log off the internet and go for a ride.
    Join Date
    Feb 2012
    Location
    Navy Yard
    Posts
    3,673
    Post Thanks / Like

    Default

    So "fun" this morning! Maine Ave westbound was closed at 9th, so all traffic was being diverted up 9th. Looking back, I think the sidewalk on the north side of Maine was actually open, but it was unclear from where I was and the cement looked wet too. So I cut up to Banneker and took the Case Bridge.


Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •