-
Mr. Kelley said the cyclist was a "gentleman," which leaves quite a few of us out.
-
Post Thanks / Like - 1 Likes, 0 Dislikes, 0 ELITE
-

Originally Posted by
huskerdont
Mr. Kelley said the cyclist was a "gentleman," which leaves quite a few of us out.
I was being generous, in case it was actually one of you.
Scallywag or rapscallion would also be accurate.
-
Just noticed yesterday that at some point, the roots busting out of the pavement on the Mount Vernon Trail right at the connection with the 4MR trail (southbound side) have been removed and the little patch there is now level. Thanks to whomever addressed that!
-
Post Thanks / Like - 2 Likes, 0 Dislikes, 0 ELITE
-
I'd like to borrow their grinder for a day or two.
It's nice having the whole lane smooth there. When the leaves are out its hard to see around the corner.

Originally Posted by
tnelson
Just noticed yesterday that at some point, the roots busting out of the pavement on the Mount Vernon Trail right at the connection with the 4MR trail (southbound side) have been removed and the little patch there is now level. Thanks to whomever addressed that!
-
The Parkway staff took care of it. Never hurts to let them know you appreciate it.
GWMP_Superintendent@nps.gov
-
Post Thanks / Like - 1 Likes, 0 Dislikes, 0 ELITE
-

Originally Posted by
GovernorSilver
Near King St. Metro, tere was ongoing resurfacing of Cameron St. near the intersection with Buchanan St and the access to the connector trail to Braddock Metro. Heavy machinery rolling around, that I had to kind of ride around. Hopefully they're done by this evening.
I should check up on what's going on with Eads - might go the Eads-Commonwealth route instead this evening.
Four Mile Run Trail west of Rt. 1 is pretty much a mountain bike path, with this sign.

However on the Glebe side, there's no sign indicating the Rt.1 to Glebe portion is closed.
-
We need to plant a mole in the GWMP Maintenance Division. After I get my big 3 I would be happy to cut grass for them.
According to https://www.nps.gov/gwmp/learn/manag...andoffices.htm this is the guy we need to get on board with biking:
Tony Migliaccio, Chief of Maintenance
703‑419‑6412

Originally Posted by
dbb
-
There is broken pavement/concrete debris on the Roosevelt Bridge sidewalk on the Kennedy Center side, should this be reported to DDOT Street & Bridge Maintenance?
-
-

Originally Posted by
Tania
Sigh.
Now Tania, you still have the TRI Mulch Bog to ride through. Maybe if we can get @dbb to ask NPS nicely, they will leave it there for you after the trail repaving is done.
-
Post Thanks / Like - 1 Likes, 0 Dislikes, 0 ELITE
Bookmarks