Page 8 of 9 FirstFirst ... 6789 LastLast
Results 71 to 80 of 88

Thread: Support the Trail Bridge over Lee Highway

  1. #71
    Join Date
    Jun 2012
    Location
    South Arlington
    Posts
    258
    Post Thanks / Like

    Default

    letter sent.

  2. Likes dasgeh liked this post
  3. #72
    Join Date
    Jun 2012
    Location
    The forgotten corner of Alexandria, VA
    Posts
    2,471
    Post Thanks / Like

    Default

    email sent

  4. Likes dasgeh liked this post
  5. #73
    mstone is offline I really need to log off the internet and go for a ride.
    Join Date
    Jun 2011
    Posts
    3,872
    Post Thanks / Like

    Default

    oh great, there's that horrible render right at the top of the page

  6. #74
    Join Date
    Mar 2011
    Location
    Columbia Pike
    Posts
    1,334
    Post Thanks / Like

    Default

    Arlington County Board Weighs-in on Environmental Assessment of I-66 Eastbound Widening Plan

    Impacts to the regional trail network – VDOT has proposed realigning the Custis Trail at Bon Air Park and grade-separating the crossing of the W&OD Trail at Lee Highway. The Board resolution endorses these improvements and asks that VDOT ensure a robust community process will be incorporated into the design process to achieve a context sensitive solution for the W&OD Trail changes.

  7. Likes mstone, Sunyata, Steve O, lordofthemark liked this post
    ELITE rcannon100 ELITED this post
  8. #75
    rcannon100's Avatar
    rcannon100 is offline Puppies! Puppies! Puppies! Puppies! Puppies!
    Join Date
    Sep 2011
    Location
    "Ever tried. Ever failed. No matter. Try Again. Fail again. Fail better." ~ Samuel Beckett
    Posts
    3,768
    Post Thanks / Like

    Default

    Quote Originally Posted by chris_s View Post
    Arlington County Board Weighs-in on Environmental Assessment of I-66 Eastbound Widening Plan

    Impacts to the regional trail network – VDOT has proposed realigning the Custis Trail at Bon Air Park and grade-separating the crossing of the W&OD Trail at Lee Highway. The Board resolution endorses these improvements and asks that VDOT ensure a robust community process will be incorporated into the design process to achieve a context sensitive solution for the W&OD Trail changes.
    "The County further recommended that the bridge be named The Chris Slatt Bridge in recognition of Mr. Slatt's tireless advocacy."

  9. ELITE Sunyata ELITED this post
  10. #76
    Join Date
    Dec 2009
    Posts
    4,695
    Post Thanks / Like

    Default

    Heads up! Meeting next month and commenting period is open: http://campaign.r20.constantcontact....c-3765facd051d


    Public Planning Workshop, April 5

    Transform 66 Inside the Beltway
    Eastbound Widening Project

    W&OD Trail Pedestrian and Bicycle Bridge
    over U.S. Route 29

    The Virginia Department of Transportation (VDOT) will host a planning workshop to gather input from the public on bridge options and design details for the W&OD Trail Pedestrian and Bicycle Bridge over U.S. Route 29 (Lee Highway), which will be built as part of the Transform 66 Inside the Beltway Eastbound Widening Project.

    Workshop Date and Location

    Wednesday, April 5, 2017
    6:00-8:00 p.m.
    Yorktown High School
    5200 Yorktown Boulevard, Arlington, VA 22207

    Stop by between 6 p.m. and 8 p.m. to participate in the workshop and provide input. VDOT will hold a short presentation beginning at 6:30 p.m. followed by a public participation session.

    Your Input is Important

    How to Provide Your Comments:
    Submit your comments on the comment sheet at the workshop
    Email your comments or questions to Transform66@VDOT.Virginia.gov
    Mail written comments to Ms. Amanda Baxter, Special Projects Development Manager, VDOT Northern Virginia District, 4975 Alliance Drive, Fairfax, VA 22030
    Please reference "W&OD Trail Bridge" in the subject line.

    Submit your comments by April 21, 2017.

  11. #77
    Join Date
    Apr 2011
    Location
    Living in the world
    Posts
    428
    Post Thanks / Like

    Default

    Quote Originally Posted by mstone View Post
    oh great, there's that horrible render right at the top of the page
    Yeah. No one pays attention to the disclaimer, and that's the picture opponents are going to paint. And if that were the final design, I'd probably oppose it too.

  12. #78
    Join Date
    Mar 2011
    Location
    Columbia Pike
    Posts
    1,334
    Post Thanks / Like

    Default

    Well that's certainly an aesthetic improvement.
    Name:  bridge.jpg
Views: 82
Size:  19.9 KB

    More: http://inside.transform66.org/meetin..._materials.asp

  13. Likes EasyRider, huskerdont, Tania, bobco85 liked this post
  14. #79
    mstone is offline I really need to log off the internet and go for a ride.
    Join Date
    Jun 2011
    Posts
    3,872
    Post Thanks / Like

    Default

    Getting better, but VDOT sure does like their prison exercise yard fencing.

  15. #80
    Join Date
    Dec 2015
    Location
    Arlington
    Posts
    1,025
    Post Thanks / Like

    Default

    WashCycle has a post on this as well. I expect that if that design is kept, we'll be seeing video of Drevil riding the raised center.

  16. Likes Birru, bobco85 liked this post

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •