The bad patch of trail bumps on the north end of Gravelly Point were removed on Saturday by Friends of the Mount Vernon Trail.
Check out the work at https://youtu.be/RNmQVDHWjVQ?si=73xYS4ZKDcK_1Pq4
Type: Posts; User: Judd
The bad patch of trail bumps on the north end of Gravelly Point were removed on Saturday by Friends of the Mount Vernon Trail.
Check out the work at https://youtu.be/RNmQVDHWjVQ?si=73xYS4ZKDcK_1Pq4
The gap between the 14th St Bridge and the 15th Street Cycletrack has been filled thanks to a recent repaving by NPS. The Cycletrack is useable but not yet complete.
Here's a video if you'd like...
Thanks to the cabal for all of the work to organize BAFS.
Trail bump removal isn't a marketed use for scarifiers. We've only found 1 other group doing it. They're marketed pretty heavily for traffic line removal, uneven sidewalks and surface preparation on...
That was us! We removed the bumps between the little trail to the airport and Four Mile Run. We're finishing the last of the bumps in Alexandria by the power plant next Saturday and will be starting...
Miss you too Andy! We've joked some about having to reinstall bumps for speed calming purposes.
This was done by Arlington County based on a 311 request submitted by Friends of the Mount Vernon Trail. The staff member handling the request was great. He checked out the area the day after the...
SmartWool base layers and socks were a game changer for winter cycling. REI usually has good deals on them near the end of winter when they are trying to clear inventory.
Sent from my iPhone...
The Friends of the Mount Vernon Trail signed a partnership agreement with EDCO on Friday. EDCO is the manufacturer of the machine we use to remove trail bumps from the Mount Vernon Trail. We'll be...
Bzzzzzzz.
30905
Good to see several forum members out to ride the Parkway. We'll hopefully do it again in the future.
30899
This Saturday is going to be the largest Tour de Mount Vernon ever. There's still time to sign up. Details and registration are at...
An FoMVT volunteer took care of the ones on Trollheim tonight.
I seem to recall that Arlington built this park so it should be a 311 request.
There are replacement seals for these pumps that are supposed to be replaced yearly.
Sent from my iPhone using...
It’s not officially abandoned though it hasn’t served any customers since around 2013 after the power plant shut down and WaPo stopped using Robinson Terminal for paper storage. He HRP folks intend...
Moped and tree are gone. NPS cleared out a massive amount of honeysuckle overgrowing the trail this summer. They even managed to back a chipper shredder down the trail and through the tunnel. The...
An ADA complaint might be effective in this instance since they did install a ramp but not an ADA compliant one. The process is pretty easy. I had a good and successful experience using it to get...
If you're looking for suggested comments, Friends of the Mount Vernon Trail have some here:...
Laughing at the thought of a press photo of people cutting a ribbon in front of a salad bar.
George Washington Memorial Parkway can be contacted at https://www.nps.gov/gwmp/contacts.htm
Now of course African swallows are non-migratory.
Bridge 24 is now open and looks marvelous.
For TR Bridge users, a Friends of the Mount Vernon Trail volunteer cleared most of the overgrowth tonight.
If you think that's rad, please help improve the trail by volunteering at...
Not quite near the airport but I have rented from Wheel Works in Winter Garden. They have a variety of different bike types and are located right on the West Orange Trail which is one of my favorite...
Work should start on Bridge 23 soon. Construction was originally slated to begin in July. There was an issue with a migratory bird nesting underneath the bridge that contributed to a schedule impact.
A few more pictures from FoMVT Twitter: https://twitter.com/MtVernonFriends/status/1690769504454778881?s=20
Will try to get an update on if it needs more extensive repairs than the deck board and...