Search:

Type: Posts; User: chris_s

Page 1 of 20 1 2 3 4

Search: Search took 0.04 seconds.

  1. Take Action: Extend the Quincy St PBL / A Critical Link to Fairfax County / eScooters

    Support an extension of the Quincy Street Protected Bike Lane, bike facilities on 5th St S (a critical connection to Fairfax County) and give feedback on e-scooters, e-bikes and other shared use...
  2. Replies
    18
    Views
    786

    A ride from Acme Pies to Livin the Pie Life would...

    A ride from Acme Pies to Livin the Pie Life would be a great example for our decision makers of how terrible some areas still are for biking in Arlington.

    Columbia Pike >> Glebe Rd. *blech*
  3. Replies
    15
    Views
    852

    For what it's worth, Arlnow's editor tweeted that...

    For what it's worth, Arlnow's editor tweeted that Arlington FD says they were NOT hit by a motor vehicle and that they're in stable condition with non-life-threatening injuries.
    ...
  4. Looks raised to me. ...

    Looks raised to me.
    http://mizook.com/keep/raised.jpg
  5. I expect that the raised crosswalk will be built...

    I expect that the raised crosswalk will be built the same time that the new refuge island is built (the next construction phase).
  6. You sure? I am relatively certain that this is...

    You sure? I am relatively certain that this is NOT the case here. In my experience this is only when covering consent agenda items that have been pulled for a hearing.
  7. Replies
    13
    Views
    1,739

    My read on the situation which I alluded to long...

    My read on the situation which I alluded to long ago in this thread:

    The Army is deciding how much space to give the County.
    The County is deciding how to allocate it.

    To get more space for...
  8. You're singing my song...

    You're singing my song.

    The existing interchange with Washington Blvd is extremely stressful and dangerous. Those riding in the road must not only contend with speeding traffic, but also with the...
  9. Replies
    20
    Views
    1,796

    I thought we'd all agreed to call the South/East...

    I thought we'd all agreed to call the South/East trail the Fort Cass Trail.
  10. The online survey is up now if you would like to...

    The online survey is up now if you would like to share your feedback.

    Here are some thoughts from Sustainable Mobility for Arlington County, if you have other thoughts please share them so we can...
  11. Tonight's meeting will present a new concept...

    Tonight's meeting will present a new concept plan, quite different from Concept #1 which was presented last October. Final drawings of Concept #2 aren't out yet, but early drafts of this concept are...
  12. TAKE ACTION: Protected Bike Lanes in Rosslyn, a Vital Link in Westover & more...

    Fight for protected bike lanes in Rosslyn, a vital link through the core of Westover (Beer Garden anyone?) and anything else on your mind via Open Door Mondays.

    Here are three things you can do...
  13. Replies
    375
    Views
    76,489

    Washington Blvd Trail Phase 2 is now appearing in...

    Washington Blvd Trail Phase 2 is now appearing in Google Maps and being used for routing.
  14. Replies
    4
    Views
    831

    If you e-mail them to me I can put them up on my...

    If you e-mail them to me I can put them up on my server and post the links here.
  15. Replies
    0
    Views
    234

    A #Bike4ThePike Progress Update

    tl;dr: So far we've got a contraflow lane and promises of capital projects 4+ years in the future. More work to do. Also #Bike4ThePike nominated for a WABA Award. Vote here.

    Read the full...
  16. You're just supposed to pick a team (or ALL) and...

    You're just supposed to pick a team (or ALL) and pick a timeframe (day, week or all-time). It will then load the data (this might take a bit, especially for all teams). Once it loads it all, you...
  17. Where are Freezing Saddles Participants Riding? Find out here.

    The Freezing Saddles heatmaps are back!

    http://dcbikemap.com/heat/

    Enjoy!

    Example screenshot:
    http://mizook.com/keep/heatmap.png
  18. It's a well-supported hope. NOVAParks has a...

    It's a well-supported hope. NOVAParks has a feasibility study in-hand that covers Broad Street to George Mason Drive.

    18672
  19. Your hope has been realized....

    Your hope has been realized.
    http://mizook.com/keep/mckinley.png
  20. Arlnow.com article on the MTP Bike Element Update

    In case you'd care to spar with anonymous trolls in the comments:
    ...
  21. Replies
    16
    Views
    3,113

    The jurisdictions own CaBi including all of the...

    The jurisdictions own CaBi including all of the bikes and all of the stations.

    CaBi is operated, under contract, by a company called Motivate (formerly called Alta bikeshare).

    Motivate was...
  22. Replies
    16
    Views
    3,113

    Don't expect a lot of CaBi expansion in Arlington...

    Don't expect a lot of CaBi expansion in Arlington anytime soon. CaBi's capital budget was obliterated in the most recent Capital Improvement Plan. They've basically just got enough to replace...
  23. Indeed. Simplifies the connection to Long Bridge...

    Indeed. Simplifies the connection to Long Bridge Park, but complicates any potential connection to Case Bridge.
  24. Seems like a Case Bridge connection could be...

    Seems like a Case Bridge connection could be relatively straightforward. Things don't get too squeezy until NPS HQ. Yellow would be new bridge/trail, green is existing Case Bridge sidepath to...
  25. Replies
    8
    Views
    1,132

    If anyone wants to check out the trail from afar,...

    If anyone wants to check out the trail from afar, I uploaded some geotagged photos to mapillary.
Results 1 to 25 of 500
Page 1 of 20 1 2 3 4